fr

Montreal General Hospital

Health

Share

Facebook / Twitter

Client

Centre universitaire de santé McGill

Date

2011
Montreal General Hospital

The reorganisation of one of the two angiography rooms and the control room of the Montreal General Hospital was conducted in several phases, in occupied rooms, which complicated the organisation of the actual work of the project. The activity had to be maintained in the second angiography room, next to the one we intervened in, in order to interfere as little as possible with patient care.

The works included the installation of a new angiography unit (fluoroscope), the restructuring the control room, the design and installation of integrated furniture for the storage of medical equipment and the renewal of the interior finishes. Work was also done to the roof allow the installation of new equipment.

Cost

645 000 $